Detail Report Harian
Informasi Laporan
29 Dec 2025
P12-611
Raharjo
Project
Penerangan
29/12/2025 22:34
Keterangan Pekerjaan
1.
-melepas high bay loading dock rawmate line 8(sisi selatan compressor waterline)
-menarik kabel power panel penerangan mezzanine line 10
-melepas high bay loading dock rawmate line 8(sisi selatan compressor waterline)
-menarik kabel power panel penerangan mezzanine line 10
Foto Dokumentasi (1 foto)
Foto 1
1 / 1