Detail Report Harian
Informasi Laporan
28 Jan 2026
P12-611
Raharjo
Project
Penerangan
29/01/2026 06:11
Keterangan Pekerjaan
1.
-merapikan power speed door line 8 - line 10
-merapikan power speed door line 10-coridor
-perbaikan panel slim padam area retain aseptic
-membuat support simon area AT line 10
-merapikan power speed door line 8 - line 10
-merapikan power speed door line 10-coridor
-perbaikan panel slim padam area retain aseptic
-membuat support simon area AT line 10