Detail Report Harian
Informasi Laporan
09 Mar 2026
P12-611
Raharjo
Maintenance
Penerangan
09/03/2026 22:07
Keterangan Pekerjaan
1.gambar sebelum Repair
-Replacement stop kontak laboratory QAS dari 2 hole menjadi 3 hole
-Replacement opple padam area premix,ada air di spandril atapnya
-Replacement high berkedip bay finish good Line 8,sisa 1 pcs tertutup material
-Replacement high bay berkedip area rawmate arah transfer process
-Repair panel slim opple padam area warehouse milku area rawmate.
-Replacement stop kontak laboratory QAS dari 2 hole menjadi 3 hole
-Replacement opple padam area premix,ada air di spandril atapnya
-Replacement high berkedip bay finish good Line 8,sisa 1 pcs tertutup material
-Replacement high bay berkedip area rawmate arah transfer process
-Repair panel slim opple padam area warehouse milku area rawmate.
Foto Dokumentasi (2 foto)
Foto 1
Foto 2
1 / 2