| No | Tanggal | Nama | Jenis | Sub Pekerjaan | Keterangan | Aksi |
|---|---|---|---|---|---|---|
| 1 | 04/03/2026 | Raharjo | 🏗️ Project | Penerangan |
Pulling cable power untuk air curtain area packaging 3 titik dan blowing sipa Line 8 1 pcs.
|
|
| 2 | 03/03/2026 | Fedryk | 🔧 Maintenance | Jaringan & CCTV |
Connecting cable timbangan premix. Ada 3 timbangan, 2 normal,1 masih error. Connecting Done.
|
|
| 3 | 27/02/2026 | Raharjo | 🔧 Maintenance | Penerangan |
-melepas high bay area preparation area process
-Replacement high bay 3 pcs berkedip finish good Line 8
1.gambar sebelum Repair
2.gambar setelah Repair.
|
|
| 4 | 27/02/2026 | - | 🔧 Maintenance | MPD / SDP |
Cleaning and Repair Fan panel 9pcs Cap Bank PH 1 : Belum selesai.
|
|
| 5 | 26/02/2026 | Raharjo | 🔧 Maintenance | Penerangan |
Replacement lighting berkedip
1.
-PJU sisi utara colling tower Line 10
-high bay charger forklift waterline
-high bay loading dock finish good waterline
-PJU area Ro
-Replacement saklar area chemical rawmate.
|
|
| 6 | 26/02/2026 | Dayat | 🔧 Maintenance | Genset |
Installation vanbelt generator 2 ph1 sudah selesai.
|
|
| 7 | 25/02/2026 | - | 🏗️ Project | Genset |
Installation kawat loket generator ( selesai).
|
|
| 8 | 25/02/2026 | - | 🏗️ Project | Trafo |
Installation kawat loket area Trafo PH 2, ( tinggal 1 jendela kawat ram habis ).
|
|
| 9 | 25/02/2026 | Raharjo | 🏗️ Project | Penerangan |
1.
-Finishing Installation TL dan sourface mounting area pelletizer Line 2
waterline
-Installation power jet cleaner area process waterline.
|
|
| 10 | 25/02/2026 | Dayat | 🏗️ Project | MPD / SDP |
Penambahan lighting fixture belakang panel MDP 3/4 sudah selesai power ikut lighting fixture ruang MDP PH 2.
|