| 1 | 12/03/2026 | P15-375 | Raharjo | 🏗️ Project | Penerangan |
1.
Upgrade Installation panel penerangan area palletizer Line 8 done.
|
🖼️ 1 foto | |
| 2 | 11/03/2026 | 2412001360 | Dayat | 🔧 Maintenance | MPD / SDP |
Taging SDP AHU 1 packaging bekum selesai terkendala area yg sulit di jangkau.
|
🖼️ 2 foto | |
| 3 | 11/03/2026 | P15-375 | Raharjo | 🏗️ Project | Penerangan |
1.
-panel penerangan packing Line 6 done
-panel penerangan palletizer Line 8 progres,dilanjut besok.
|
🖼️ 1 foto | |
| 4 | 10/03/2026 | P15-069 | Taufik | 🔧 Maintenance | MPD / SDP |
Repair kontaktor Cap Bank 1 Line 6-7 ;
1. K3 ( selesai )
2. K13A
Dan masih bermasalah antara Kontaktor K13A dan K13B.
|
🖼️ 1 foto | |
| 5 | 10/03/2026 | P15-375 | Raharjo | 🏗️ Project | Penerangan |
-Check sheet
Setelah istirahat siang
-merakit upgrade panel area packing Line 6 dan palletizer Line 8.
|
🖼️ 1 foto | |
| 6 | 10/03/2026 | 2412001360 | Dayat | 🔧 Maintenance | MPD / SDP |
Taging SDP AHU 2 masih belum selesai terkendala banyak breaker yg belu ndi taging.
|
Tidak ada | |
| 7 | 09/03/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
1.gambar sebelum Repair
-Replacement stop kontak laboratory QAS dari 2 hole menjadi 3 hole
-Replacement opple padam area premix,ada air di spandril atapnya
-Replacement high berkedip bay finish good Line 8,sisa 1 pcs tertutup material
-Replacement high bay berkedip area rawmate arah transfer process
-Repair panel slim opple padam area warehouse milku area rawmate.
|
🖼️ 2 foto | |
| 8 | 09/03/2026 | P15-069 | Taufik | 🔧 Maintenance | MPD / SDP |
Replace Contactor Capacitor Bank 2 Line 8-10 Asseptic ;
• KM 5 ?
• KM 6 ?
• KM 12A ?
• KM 15B ?
• KM 16A ? ( tinggal repair cable ).
|
🖼️ 1 foto | |
| 9 | 07/03/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
-memasang gantungan tambahan high bay area preparation area process 3 titik
-Replacement high bay berkedip area finish good Line 8.
|
🖼️ 1 foto | |
| 10 | 05/03/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
Repair lighting
-flood light area parkir motor
-opple area coridor depan musholla aseptic
-opple panel slim premix,1 pcs padam,1 pcs berkedip
Catatan:setelah istirahat siang menulis spk dan menyiapkan material Installation TL palletizer Line 6
Keterangan
1.gambar sebelum Repair
2.gambar setelah Repair.
|