| 1 | 09/03/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
1.gambar sebelum Repair
-Replacement stop kontak laboratory QAS dari 2 hole menjadi 3 hole
-Replacement opple padam area premix,ada air di spandril atapnya
-Replacement high berkedip bay finish good Line 8,sisa 1 pcs tertutup material
-Replacement high bay berkedip area rawmate arah transfer process
-Repair panel slim opple padam area warehouse milku area rawmate.
|
🖼️ 2 foto | |
| 2 | 09/03/2026 | P12-167 | - | 🔧 Maintenance | MPD / SDP |
Replace Contactor Capacitor Bank 2 Line 8-10 Asseptic ;
• KM 5 ?
• KM 6 ?
• KM 12A ?
• KM 15B ?
• KM 16A ? ( tinggal repair cable ).
|
🖼️ 1 foto | |
| 3 | 07/03/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
-memasang gantungan tambahan high bay area preparation area process 3 titik
-Replacement high bay berkedip area finish good Line 8.
|
🖼️ 1 foto | |
| 4 | 05/03/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
Repair lighting
-flood light area parkir motor
-opple area coridor depan musholla aseptic
-opple panel slim premix,1 pcs padam,1 pcs berkedip
Catatan:setelah istirahat siang menulis spk dan menyiapkan material Installation TL palletizer Line 6
Keterangan
1.gambar sebelum Repair
2.gambar setelah Repair.
|
🖼️ 2 foto | |
| 5 | 04/03/2026 | P15-375 | Raharjo | 🏗️ Project | Penerangan |
Pulling cable power untuk air curtain area packaging 3 titik dan blowing sipa Line 8 1 pcs.
|
🖼️ 1 foto | |
| 6 | 03/03/2026 | 2312001331 | Fedryk | 🔧 Maintenance | Jaringan & CCTV |
Connecting cable timbangan premix. Ada 3 timbangan, 2 normal,1 masih error. Connecting Done.
|
🖼️ 1 foto | |
| 7 | 27/02/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
-melepas high bay area preparation area process
-Replacement high bay 3 pcs berkedip finish good Line 8
1.gambar sebelum Repair
2.gambar setelah Repair.
|
🖼️ 2 foto | |
| 8 | 27/02/2026 | P12-167 | - | 🔧 Maintenance | MPD / SDP |
Cleaning and Repair Fan panel 9pcs Cap Bank PH 1 : Belum selesai.
|
🖼️ 2 foto | |
| 9 | 26/02/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
Replacement lighting berkedip
1.
-PJU sisi utara colling tower Line 10
-high bay charger forklift waterline
-high bay loading dock finish good waterline
-PJU area Ro
-Replacement saklar area chemical rawmate.
|
🖼️ 1 foto | |
| 10 | 26/02/2026 | 2412001360 | Dayat | 🔧 Maintenance | Genset |
Installation vanbelt generator 2 ph1 sudah selesai.
|
🖼️ 1 foto |