| 1 | 25/02/2026 | P12-167 | - | 🏗️ Project | Genset |
Installation kawat loket generator ( selesai).
|
🖼️ 1 foto | |
| 2 | 25/02/2026 | P12-167 | - | 🏗️ Project | Trafo |
Installation kawat loket area Trafo PH 2, ( tinggal 1 jendela kawat ram habis ).
|
🖼️ 1 foto | |
| 3 | 25/02/2026 | P15-375 | Raharjo | 🏗️ Project | Penerangan |
1.
-Finishing Installation TL dan sourface mounting area pelletizer Line 2
waterline
-Installation power jet cleaner area process waterline.
|
🖼️ 1 foto | |
| 4 | 25/02/2026 | 2412001360 | Dayat | 🏗️ Project | MPD / SDP |
Penambahan lighting fixture belakang panel MDP 3/4 sudah selesai power ikut lighting fixture ruang MDP PH 2.
|
🖼️ 1 foto | |
| 5 | 25/02/2026 | 2412001360 | Dayat | 🔧 Maintenance | MPD / SDP |
Repair pompa air pembuangan ac warehouse lid sudah selesai.
|
🖼️ 1 foto | |
| 6 | 24/02/2026 | P15-375 | Raharjo | 🏗️ Project | Penerangan |
1.Installation penerangan TL area palletizer Line 2 waterline.
|
🖼️ 1 foto | |
| 7 | 23/02/2026 | 2412001360 | Dayat | 🔧 Maintenance | Genset |
Charger aki pompa hidrant sudah selesai dan Repair pintu speedor sipa blowing sudah selesai.
|
🖼️ 2 foto | |
| 8 | 23/02/2026 | P15-375 | Raharjo | 🔧 Maintenance | Penerangan |
Pekerjaan di warehouse sewa gempol
1.
-Ac Mes dan penerangan di warehouse nomor 1 dan 2 sudah normal,sebelumnya cable twisted ada yang longgar
-penambahan penerangan sisi belakang warehouse nomor 5.
|
🖼️ 1 foto | |
| 9 | 23/02/2026 | 2412001360 | Dayat | 🔧 Maintenance | MPD / SDP |
Repair mcb helix dr breker 250 ke mcb 50 sudah selesai.
|
🖼️ 1 foto | |
| 10 | 21/02/2026 | 2412001360 | Dayat | 🔧 Maintenance | Penerangan |
1. Pulling cable grounding system system system area filling, mezanin dan process Line 10.
|